CRD was asked by SATORP/Aramco to undertake an ergonomic study to review an existing control building floor
plan and make recommendations on: console sizes, groupings, spacings and all aspects of traffic flows, etc. within
the control building. Within 4 weeks of project start-up, CRD had initial recommendations for the basic arrangment
of the console groupings within the control room.
![]() ![]() ![]() Following preparation of CRD's control room layouts, the preferred console supplier (Evans) prepared several
renderings for presentation to SATORP.
![]() ![]() |
||||
|